fbpx

With more resources and increased ability to supply custom solutions, Wastech was able to introduce an entirely new division named Major Projects. The introduction of the Major Projects team saw the largest Material Recovery Facility (MRF) designed, manufactured, and installed in Wastech’s history; the Perth Waste MRF; designed to process an astounding 30 tonnes of Kerbside comingled recyclables per hour.